BAE Systems Site Redevelopment Programme

Download PDF

The £300 million eight year Site Redevelopment Programme is delivering a mix of new build projects and the refurbishment of existing facilities to enable the Barrow-in-Furness site to deliver the next generation of the UK strategic nuclear deterrent submarines.

The implementation of CEMAR across this portfolio of work has been a resounding success, enabling robust contract control across multiple NEC Professional Services and Engineering and Construction Contracts.  Over 30,000 communications have been adminstered in the system across ECC, ECSC and PSC contracts.

We look forward to continuing to serve BAE and their extensive supply chain with our simple and effective system for administering NEC.

"CEMAR has been integral to the successful management of the programme.  The intuitive interface has been an enabler to those not experienced in the use of NEC3 and the powerful reporting capability provides confidence that we are in full control of our contracts at all times. We cannot recommend the CEMAR system highly enough."
Mike Bartlett, Senior Supply Chain Manager, BAE Systems


Back to Case Studies

Latest Case Studies

Case Study | 01 Aug 2017

VolkerFitzpatrick Rail Projects

By Nick Woodrow
Case Study | 10 Jul 2017

Hinkley Point C, Nuclear New Build mega project to power the future

By Nick Woodrow
Case Study | 02 May 2016

The British Museum

By Nick Woodrow
Case Study | 12 Sep 2016

Canal & River Trust, 2,000 miles of waterways

By Nick Woodrow
Case Study | 20 Jul 2016

Dounreay Site Restoration Limited, portfolio of NEC contracts

By Nick Woodrow

Arrange a live demo

Schedule a tailored and interactive webinar, or book a live demonstration with one of our experts at a time and place to suit your team.