BAE Systems

BAE Systems Site Redevelopment Programme

BAE Systems are a multinational defence and aerospace company. One division, BAE Systems Maritime, have supplied nearly all nuclear-powered submarines for Britain since 1963. The Cumbria based shipyard is undergoing a £300 million, eight-year programme to deliver a mix of new build projects, and the refurbishment of existing facilities for the next generation of the UK strategic nuclear deterrent submarines. This will include an extension to the existing Devonshire Dock Hall, as well as an 8000m2 Central Training Facility.

The use of CEMAR across this portfolio of work has been a resounding success, enabling robust contract control across multiple NEC3 Contracts, including Professional Services and Engineering and Construction Contracts. We look forward to continuing to serve BAE and their extensive supply chain, including Contractor Morgan Sindall, with our simple and effective contract management solutions.

"CEMAR has been integral to the successful management of the programme.  The intuitive interface has been an enabler to those not experienced in the use of NEC3 and the powerful reporting capability provides confidence that we are in full control of our contracts at all times. We cannot recommend the CEMAR system highly enough."
Mike Bartlett, Senior Supply Chain Manager, BAE Systems

Reference: Imagery source; ©BAE Systems.


Back to Case Studies

Latest Case Studies

Case Study |

ITER

By Nick Woodrow
Case Study |

VolkerFitzpatrick

By Nick Woodrow
Case Study |

Hinkley Point C

By Nick Woodrow
Case Study |

The British Museum

By Nick Woodrow
Case Study |

Canal & River Trust

By Nick Woodrow

Arrange a live demo

Schedule a tailored and interactive webinar, or book a live demonstration with one of our experts at a time and place to suit your team.